Skip to main content

Week 5

(June 25, 2026 – July 02, 2026)

Meeting 1

Date: June 25, 2026 Attendees:

Summary:

  • Presented the working of the application along with the UI I created.
  • Shaheem suggested the following UI improvements:
    • Add search functionality on the dashboard page to easily find records in the dashboard table.
    • Add search functionality on the raw/diff and editor pages to easily navigate through merged documents.
    • Optimize the UI for large merged reports.
  • Also suggested testing the UI and backend with around 50 merged reports to verify application performance.

Meeting 2

Date: July 02, 2026
Attendees:

Summary:

  • Meanwhile the mentors are compiling testdata to test the accuracy of the merge engine, everyone agreed that I should move on to the last part of the project which is integration with sw360 and fossology.
  • Shaheem asked me to locally setup and explore sw360 to find solutions on how to integrate sw360 in the report aggregator project.
  • Same goes for fossology, since I already have fossology setup on my machine, the only thing needed to be done was to explore ways to integrate this into the report aggregator project.