Week 1
Welcome to meeting minutes page for GSoC 2025 at FOSSology 05-06-2025.
Attendees:
Missed:
General
-
Shaheem Azmal M MD: General updates regarding project, Request to update the gsoc wiki before joining the call.
-
Gaurav Mishra: Requests all the mentors/contributors to send the meeting invites to him or kaushl, so that the timings and invites can be added to WIKI.
Updates from contributors
-
-
This week. I spent most of the time looking into Atarashi Code base.
-
I have fixed few minor bugs, and versioning issyes that had been deprecated in libraries like pandas.
-
Started working on the license possibility detector and initially I started with the keyword based approach as similar to what is used by nomos.
-
I have started looking at algorithms which will allow us to move towards a ML based model for possibility detection and also exploring the Minerva data set for that.
-
-
-
I have gone through developers guide of ORT.
-
Discussed with mentors on how to integrate nomos with ORT.
-
Have also gone through the documentation of ORT and SCAN code to follow the same process for FOSSology.
-
-
-
I have been working on Export of SPDX and readmeoss reports to OSSelot project.
-
We have added a setting in conf page. and recieved feedback from mentor.
-
-
- No Update Available.
-
-
Worked on go-lang migration issues and currrntly it is in the review phase.
-
Currently working on Authentication part.
-
-
- No Update Available.
-
-
Spent time on installing FOSSology and safaa projects locally.
-
Currently focusing on pulling copyrights from fossology instance to train.
-
-
-
I have been working on a heuristic analysis for all the pages that have been mentioned in issues page.
-
I am also working on the redesign for the header and footer separately. So I was just exploring a few ways on how to.
-
Redesign and then we also looked into a few and got a a little bit of input on that. So yeah, currently I've been mostly working on that itself and yeah,
-
We had discussions on logo design, font families, colors that I can use in the redesign.
-
-
-
I have completed my final exams in during community bonding period and had meetings with Soham and Avinal.
-
Looked into changes done by Omar's, like the PR 2086.
-
Tried to set up this changes locally and rebase it, this task is expected to finish in 2 weeks.
-
-
-
I have been looking into FOSSOLOGYUI code base.
-
Currently im working on migration of React Code based to nextJS.
-
Also spending some time for learning this.
-