Week 9 Meetings and Activities

Project Sync Meeting 10

(July 29, 2025)

Attendees

Discussion

  • Showed mentors the progress in implementation of the redesigned components.
  • Completed the implementation of the redesigned Header, Footer and Sub Header components.
  • Installed and configured required shadcn components (e.g., dropdown) to support the redesign.
  • Replaced all Lucide React icons with the custom icons designed for the FOSSology design system.

FOSSology GSoC Weekly Meet

(July 31, 2025)

Attendees:

Missed:

Discussion

Mentors

Contributors

  • Tiyasa Kundu

    • Shared Week 9 progress with the community, showcasing the completion of the implementation of Header, Footer, and Sub Header components.
    • Mentioned about the WIP Pull Request #318 openend and the commit made with the code for the implemented Header, Footer, and Sub Header components (commit link).
  • Other Contributors

    • Each contributor briefly shared their weekly progress and updates.

Activities Done in Week 9

  • Completed the implementation of the redesigned Header, Footer, and Sub Header components using Tailwind CSS and shadcn.
  • Installed and configured the required shadcn UI components (e.g., Dropdown) to support the redesign.
  • Replaced all Lucide React icons with the custom icons defined in the FOSSology design system.
  • Opened a WIP Pull Request #318 and committed the code for the implemented components.

Progress Demo

  • Redesigned Header Component:

alt text

  • Redesigned Footer Component:

alt text

Next Steps

  • Continue implementing other redesigned components and pages as per the redesigned UI mockups.