Skip to main content

Week 10 Meetings and Activities

Project Sync Meeting 11

(August 5, 2025)

Attendees

Discussion

  • Showed mentors the progress in the implementation of the redesigned components and pages.
  • Completed implementing the redesigned Home Page, including the login form, authentication integration, and alert message handling for login success/failure.
  • Completed implementing the Search Page.
  • Installed and configured required shadcn components (Button, Input, Alert, Card, Form, Accordion, Radio Group) to support the redesign.

Activities Done in Week 10

  • Implemented the redesigned Home Page with login form and authentication integration and the Search Page.
  • Added alert messages for both login success and failure states.
  • Installed and configured required shadcn components such as Button, Input, Alert, Card, Form, Accordion, Radio Group.
  • Committed the implemented Home and Search Pages source code to the open PR (commit link).
  • The Pull Request #318 got succesfully merged after code review.

Progress Demo

  • Redesigned Home Page:

alt text

  • Redesigned Search Page:

alt text

Next Steps

  • Continue implementing other redesigned components and pages as per the redesigned UI mockups.